Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LEVELISE LIMITED

1663 unique locations (19547 components) - Page 1 of 67

Active MW: 12.88 MW
Inactive MW: 0.00 MW
York Road, Stevenage, Hertfordshire, SG1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
YO8 (45 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
YO7 (19 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
YO62 (15 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.23 MW
YO60 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.23 MW
YO51 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
YO42 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
YO26 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
YO24 (25 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
YO12 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
YO11 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.23 MW
YO10 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
8.23 MW
Wykeham Close, Poole, Dorset, BH17 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
Wyberton West Road, Boston, Boston, Lincolnshire, PE21 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
WV9 (5 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
WV6 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
WV4 (16 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
WV2 (2 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4)
8.23 MW
WV12 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
WV10 (18 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
8.23 MW
WS9 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
WS5 (14 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
WS3 (24 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
WS13 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
WS11 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.23 MW
Loading map...
Showing 25 locations