Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

6554 unique locations (47992 components) - Page 251 of 263

Active MW: 1587.45 MW
Inactive MW: 268.22 MW
West Way Broadstone Dorset BH18 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WESTWICK CRESCENT SHEFFIELD S8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
WESTWICK ROAD SHEFFIELD S8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
WESTWOOD ROAD SUTTON COLDFIELD WEST MIDLANDS B73 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
Wetherby Close Consett County Durham DH8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WEYBRIDGE DRIVE MACCLESFIELD CHESHIRE SK10 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
Weymouth Drive Houghton Le Spring DH4 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
Weymouth Drive, Houghton Le Spring, DH4 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Weyside Close Byfleet West Byfleet Surrey KT14 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WF1 (24 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF10 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WF11 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
WF12 (20 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WF14 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WF16 (5 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF17 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WF2 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.12 MW
WF3 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF4 (59 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF5 (30 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF6 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WF8 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WF9 (30 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WHADDON LANE OWSLEBURY WINCHESTER HAMPSHIRE SO21 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
WHARFEDALE DRIVE RAINHILL PRESCOT MERSEYSIDE L35 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Loading map...
Showing 25 locations