Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

6554 unique locations (47992 components) - Page 259 of 263

Active MW: 1587.45 MW
Inactive MW: 268.22 MW
WOODVILLE GARDENS LONDON W5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
WOODWARD DRIVE CAMBRIDGE CAMBRIDGESHIRE CB25 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Woodward View Scunthorpe South Humberside DN16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
WOOLBROOK ROAD CRAYFORD DARTFORD DA1 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
Wooldale Road Holmfirth West Yorkshire HD9 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
WOOLER DRIVE THE MIDDLES STANLEY COUNTY DURHAM DH9 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WOOLPITCH WOOD CHEPSTOW GWENT NP16 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Woolram Wygate SPALDING LINCOLNSHIRE PE11 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.00 MW
Woolston Place SHERFIELD-ON-LODDON Hook Hampshire RG27 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
WORDSWORTH ROAD RUGBY WARWICKSHIRE CV22 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
WORRALL STREET MORLEY LEEDS LS27 (6 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2024-25 (T-1) ...
14.29 MW
WR1 (2 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.04 MW
WR10 (23 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WR11 (44 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WR13 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
WR14 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WR15 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
WR2 (32 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WR3 (30 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WR4 (26 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WR5 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WR6 (21 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.12 MW
WR7 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WR9 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
WREN CRESCENT BODICOTE BANBURY OXFORDSHIRE OX15 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Loading map...
Showing 25 locations