OCTOPUS ENERGY LIMITED

4838 unique locations (45618 components) - Page 47 of 194

Active MW: 1587.45 MW
Inactive MW: 268.22 MW
SA2 (18 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
SA18 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
SA17 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.04 MW
SA16 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
SA15 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
SA14 (14 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.08 MW
SA13 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.04 MW
SA11 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
SA10 (17 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.08 MW
S9 (4 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S81 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S80 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
S8 (31 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S75 (43 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S71 (40 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S70 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
S7 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
S66 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S65 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S64 (27 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S63 (15 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S62 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.04 MW
S61 (18 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S60 (46 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
S6 (39 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
Loading map...
Showing 25 locations