Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

55 unique locations (348 components) - Page 1 of 3

Active MW: 19456.12 MW
Inactive MW: 159.26 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (40 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
CCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_STAY-1 CMU_STAY-1 +34 more NG23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (4 components)
• Staythorpe 1 - CCGT
• Staythorpe 2 - CCGT
• Staythorpe 3 - CCGT
RWE GENERATION UK PLC Existing Generating CMU CMU_STAY-1 CMU_STAY-2 +2 more NG23
Inactive • 2017-18 (T-1)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (2)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
OCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 CMU_SEALS-1 +1 more TS2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2020-21 (T-1)
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Reciprocating engines RWE GENERATION UK PLC New Build Generating CMU CMU_HYTB18 Conditional SO45
Inactive • 2022-23 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC New Build Generating CMU CMU_FERR18 Conditional WF11
Inactive • 2022-23 (T-4)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Storage (Duration 2h) RWE GENERATION UK PLC New Build Generating CMU CMU_CHES21 CMU_CHES21 Not Prequalified CH65
Active • 2026-27 (T-4), 2025-26 (T-4)
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2021-22 (T-4)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2020-21 (T-4)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2017-18 (T-1)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (3 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
RWE Cogen UK Limited Existing Generating CMU New Build Generating CMU CMU_CHEGT1 CMU_CHES1 +1 more CH65
Inactive • 2020-21 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (1 component)

Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter

RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CH65
Inactive • 2017-18 (T-1)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2021-22 (T-4)
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
OCGT and Reciprocating Engines (Fuel Type - Gas) RWE Cogen UK Limited Existing Generating CMU New Build Generating CMU CMU_CHEGT1 CMU_CHEN17 CH65
Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) RWE GENERATION UK PLC Existing Generating CMU New Build Generating CMU CMU_HYTHE CMU_HYTHE +1 more SO45
Inactive • 2021-22 (T-4), 2020-21 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

Hythe Power Station - Auxiliary load behind boundary meter

RWE GENERATION UK PLC Existing Generating CMU CMU_HYTHE SO45
Inactive • 2017-18 (T-1)
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (1 component)

Hydroelectric run of river generating plant

Hydro RWE GENERATION UK PLC Existing Generating CMU CMU_RIVE-1 IV2
Active • 2028-29 (T-4)
Postal Address: Dulyn Weir Hydro Station, Dulyn Weir, Near Conwy, LL32 8QE. Nearest post code to the actual hydro station: LL32 8SH. (2 components)

Hydroelectric plant (2)

Hydro RWE GENERATION UK PLC Existing Generating CMU CMU_HDDI-1 CMU_HDDI-1 LL32
Active • 2028-29 (T-4), 2027-28 (T-4)
Pembroke Power Station Pembroke Dyfed SA71 5SS (50 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
CCGT Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_PEMB-11 CMU_PEMB-11 +43 more SA71
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Pembroke Power Station Pembroke Dyfed SA71 5SS (5 components)
• Pembroke 11 - CCGT
• Pembroke 21 - CCGT
• Pembroke 31 - CCGT
RWE GENERATION UK PLC Existing Generating CMU CMU_PEMB-11 CMU_PEMB-21 +3 more SA71
Inactive • 2017-18 (T-1)
Markinch Power Station Glenrothes KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Reciprocating engines RWE GENERATION UK PLC New Build Generating CMU CMU_MARK18 Conditional KY7
Inactive • 2022-23 (T-4)
Little Barford Power Station Little Barford St Neots PE19 6YT (20 components)
• Little Barford 1 CCGT MSID: 4052 (2)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Little Barford Power Station Little Barford St Neots PE19 6YT (2 components)
• Little Barford 1 CCGT
• Little Barford 1 OCGT . fuel type is gasoil
RWE GENERATION UK PLC Existing Generating CMU CMU_LBAR-1 PE19
Inactive • 2017-18 (T-1)
Loading map...
Showing 25 locations