SSE GENERATION LIMITED

14 unique locations (60 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Aldbrough Gas Storage Facility, HU11 4QB (1 component)

Battery Storage

Storage SSE GENERATION LIMITED New Build Generating CMU Aldbrough Battery Storage HU11
Inactive • 2021-22 (T-4)
Aldbrough Gas Storage Facility, HU11 4QG (1 component)

Battery Storage

Battery Storage SSE GENERATION LIMITED New Build Generating CMU Aldbrough Battery Storage HU11
Inactive • 2020-21 (T-4)
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8RG (2 components)

1 x hydro turbine & synchronous generator (2)

Hydro SSE GENERATION LIMITED Existing Generating CMU Clachan 1 Clachan 1 PA26
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Deanie Power Station, Struy, By Cannich, Inverness-shire, IV4 7JX (6 components)
• Deanie Unit 1 (2)
• Deanie Unit 2
Hydro SSE GENERATION LIMITED Existing Generating CMU Deanie 1 Deanie 1 +4 more IV4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (7 components)
• Generating Unit 1 (2)
• Generating Unit 2
Hydro SSE GENERATION LIMITED Existing Generating CMU Errochty 1 Errochty 1 +2 more PH16
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5NT (2 components)
• Generating Unit 2
• Generating Unit 3
Hydro SSE GENERATION LIMITED Existing Generating CMU Errochty 2 Errochty 3 PH16
Inactive • 2021-22 (T-4)
Fasnakyle Power Station, Cannich, Inverness-shire, IV4 7NB (3 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Hydro SSE GENERATION LIMITED Existing Generating CMU Fasnakyle 1 Fasnakyle 2 +1 more IV4
Inactive • 2021-22 (T-4)
Fasnaykyle Power Station, Cannich, Inverness-shire, IV4 7NB (9 components)
• Post-refurbishment generating unit 1
• Post-refurbishment generating unit 2
• Post-refurbishment generating unit 3
SSE GENERATION LIMITED Refurbishing Generating CMU Fasnakyle 1 Fasnakyle 1 +4 more IV4
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (6 components)
• Generating Unit 1 (2)
• Generating Unit 2
Storage SSE GENERATION LIMITED Existing Generating CMU Foyers 1 Foyers 1 +2 more IV2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV3 6YM (2 components)
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
SSE GENERATION LIMITED Existing Generating CMU Glenmoriston IV3
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV63 7YH (1 component)

Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.

Hydro SSE GENERATION LIMITED Existing Generating CMU Glenmoriston IV63
Inactive • 2021-22 (T-4)
Lochay Power Station, Killin, Perthshire, FK21 8UA (5 components)
• Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU. (2)
• Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
Hydro SSE GENERATION LIMITED Refurbishing Generating CMU Lochay Lochay +1 more FK21
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Luichart Power Station, by Loch Luichart, Contin, Ross-shire, IV14 9EW (3 components)

ROCable hydro units within the BMU are not included in the CMU. (3)

Hydro SSE GENERATION LIMITED Existing Generating CMU Luichart Luichart IV14
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (12 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Hydro SSE GENERATION LIMITED Existing Generating CMU Sloy 1 Sloy 1 +6 more G83
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...