{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

TATA STEEL UK LIMITED

7 unique locations (161 components)

Active MW: 0.00 MW
Inactive MW: 45.89 MW
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (7 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1, TS20_1 and TS21_1 as well as TS23_1 (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1 and TS20_1
DSR TATA STEEL UK LIMITED Multisite_16 Multisite_16 +5 more NP19
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (5 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1 (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity.
DSR TATA STEEL UK LIMITED Multisite_16 Multisite_16 +1 more NP19
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (2 components) Geocoding Needed

Industrial process within the Tata Steel estate - specific installations TBC (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (6 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines ) (2)
• Site based CHP - note the primary fuel are Waste Gases
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 component)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
Trostre Works Llanelli Carmarthenshire SA14 9SD (70 components)

Manufacturing site providing demand response (3)

DSR TATA STEEL UK LIMITED Multi Site_16 Other Multi Site_16 Other +5 more SA14
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Trostre Works Llanelli Carmarthenshire SA14 9SD (70 components)

Manufacturing site providing demand response (3)

DSR TATA STEEL UK LIMITED Multi Site_16 Other Multi Site_16 Other +2 more SA14
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 7 locations