TATA STEEL UK LIMITED

17 unique locations (485 components) - Page 1 of 2

Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (3 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD (187 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2024-25 (T-1) ...
To be confirmed - the components of the Unproven DSR CMU are to be determined. (2 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
To be confirmed - the components of the unproven DSR are to be determined (2 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

Inactive • 2019-20 (T-1)
TBC but targeted at: Llanwern Works NP9 0XN OS: ST 394861 Port Talbot Works, South Wales, SA13 2NG OS: SS782870 (2 components)

Industrial Steelmaking / Manufacturing Site

TATA STEEL UK LIMITED Not Prequalified NP9
Inactive • 2016-17 (TR)
4.57 MW
TBC - as this is an unproven DSR CMU we will determine the components from the Tata Steel UK estate. (1 component)

Manufacturing process within the Tata Steel estate ( specific installations to be confirmed )

Inactive • 2018-19 (T-1)
TBC (208 components)
• Aggregate CMU for multiple sources
• Aggregate CMU from Multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2028-29 (T-4), 2027-28 (T-4) ...
91.94 MW
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (9 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
43.40 MW
Port Talbot Steelworks, Port Talbot, SA13 2NG (2 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
26.81 MW