Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

TATA STEEL UK LIMITED

17 unique locations (485 components) - Page 2 of 2

Port Talbot, Port Talbot Works, SA13 2NG (10 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
19.08 MW
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (3 components)

Industrial process within the Tata Steel estate - specific installations TBC

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (22 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Components will be derived from multiple manufacturing locations & assets within TSUK. To be confirmed after initial prequalification. (2 components)

Industrial Manufacturing Site with multiple processes. Energy demand management plans already in place.

Inactive • 2017-18 (TR)
Carlton,Stockton-On-Tees,TS21 1EA (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Carlton, Stockton-on-Tees, TS21 1EA (9 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Loading map...
Showing 7 locations