THRIVE RENEWABLES (WICKEN) LIMITED

1 unique locations (9 components)

Active MW: 0.57 MW
Inactive MW: 1.44 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken. (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED Existing Generating CMU Wicken Wicken +3 more Rejected MK19
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 1 locations