{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VIRIDOR ENERGY LIMITED

7 unique locations (33 components)

Active MW: 105.95 MW
Inactive MW: 0.00 MW
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth. (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED Avonmouth ERF Avonmouth ERF +2 more BS11
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Beddington Farmlands Waste Management Facility, Beddington Lane, Croydon, Surrey, CR0 4TG (1 component)

Beddington ERF .- Energy Recovery Facility

VIRIDOR ENERGY LIMITED Beddington ERF CR0
Inactive • 2020-21 (T-4)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (2 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Exeter ERF, Grace Road South, Exeter EX2 8QE (11 components)
• Energy from Waste Facility located in Grace Road, Exeter. (2)
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Grace Road South, Exeter, EX2 8QE (2 components)

Energy from Waste Facility which exports at between 3MW and 3.5MW subject to calorific value of waste and biogenic content. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ (2 components)

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point). (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (10 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED Cardiff ERF Cardiff ERF +4 more CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 7 locations