Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CORBY POWER LIMITED

59 unique locations (242 components) - Page 1 of 6

Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (29 components)
• The CMU is a Open Cycle Gas Turbine (OCGT) (2)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1943.05 MW
Land at Enterprise Court, Corby, NN18 8ES (35 components)

Reciprocating genset (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.62 MW
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.30 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (7 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network. (4)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

Inactive • 2021-22 (T-4)
Corby Power Limited Mitchell Road Phoenix Parkway Corby NN17 5QT United Kingdom (3 components)

The CMU is a combined cycle gas turbine (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Sovereign Flour Mill, Brunel Rd, CORBY, Northants, NN17 4SL (3 components)

Flour Mill (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (4 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Deenethorpe, Corby, NN17 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
PRIDMORE ROAD CORBY GLEN GRANTHAM LINCOLNSHIRE NG33 (8 components)

EV charging at residential premises (4)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 10 locations