PEAK GEN TOP CO LIMITED

2 unique locations (4 components)

Batleys Cash and Carry Talbot Road Fareham PO15 5RY (9 components)
• The CMU component is net of the auxiliary power required (4)
• A completed power plant, with associated civil works, switchgear and electrical connection.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (9 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (8)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.50 MW