RWE GENERATION UK PLC

11 unique locations (254 components) - Page 1 of 2

Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6183.38 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (24 components)
• Didcot B5 - CCGT MSID: 4055 (2)
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4108.24 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
• Little Barford 1 CCGT MSID: 4052 (2)
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2060.91 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.91 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (25 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548 (2)
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (48 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: …
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)

Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174 (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.67 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (6 components)
• CMU will be formed of multiple individual reciprocating gas engines. (2)
• CMU will be formed of multiple individual gas reciprocating gas engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...