Home List View Map View Technologies Companies Support Us Help Login Register
Theme

SSE UTILITY SOLUTIONS LIMITED

8 unique locations (24 components)

Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
50.45 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4)
36.01 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
THATCHED COTTAGE WORTLEY WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHES THE STREET PRESTON ST. MARY SUDBURY SUFFOLK CO10 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHED COTTAGE WHITENAP LANE ROMSEY HAMPSHIRE SO51 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHES SCHOOL LANE CHEARSLEY AYLESBURY BUCKINGHAMSHIRE HP18 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 8 locations