6 unique locations (43 components)

Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
34.03 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Active • 2024-25 (T-4), 2023-24 (T-4)