Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Willington Power Limited

10 unique locations (38 components)

Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (5 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2023-24 (T-1) ...
5.79 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (8 components)

CMU consisting of multiple reciprocating engines and alternators (5)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain. (3)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (4 components)

EV charging at residential premises (4)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (4 components)

EV charging at residential premises (4)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
UNITS A, B, C & D POSTLEY ROAD KEMPSTON BEDFORD MK42 7AG (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (3)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD (4 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 10 locations