Home List View Map View Technologies Companies Support Us Help Login Register
Theme

BALANCE POWER PROJECTS LIMITED

9 unique locations 14 components Page 1 of 1
Map View
Lark's Lane, Iron Acton, Latteridge, South Gloucestershire, West of England, England, BS37 9TX (1 components)

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h)
20.9 MW
Active - 2028-29 (T-4)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines
15.0 MW
Active - 2028-29 (T-4)
Shaw Side, Heyside, Luzley Brook, Oldham, Greater Manchester, England, OL2 6HL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines
15.0 MW
Active - 2028-29 (T-4)
Wainwright Street, Hollins, Dukinfield, Tameside, Greater Manchester, England, SK16 5PL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines
15.0 MW
Active - 2028-29 (T-4)
Currock Trade Centre, Currock, Carlisle, Cumberland, England, CA2 5AD (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines
15.0 MW
Active - 2028-29 (T-4)
Ribble Court, Red Scar Business Park, Preston, Lancashire, England, PR2 5LX (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines
15.0 MW
Active - 2028-29 (T-4)
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
  • • A Distribution Connected Battery Energy Storage System.
  • • A Distribution Connected gas fueled generating station.
Reciprocating engines Storage (Duration 2h)
10.4 MW
Active - 2028-29 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h)
9.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Showing locations 1 - 9 of 9