-
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
(4)
-
• Power Station for Paper plant made up of 1x35MW Gas engine
41.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• Gas Turbine CHP GT001B
(3)
-
• Steam Turbine CHP
(2)
15.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(5)
7.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Gas Turbine CHP GT001A
(5)
5.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
On-site existing CHP generating unit
(4)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 2 more)
-
• Office site with behind the meter back-up generation
(2)
-
• Office site with behind the meter back-up generation.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Office site with behind the meter back-up generation.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
On-site existing CHP generating unit
(3)
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
On-site existing CHP generating unit
(3)
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
CHP and autogeneration
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Gas engine
(2)
-
• Gas Engine
-
• Gas Turbine Generator
-
• ... and 1 more unique descriptions
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 3 more)
Offsite with behind the meter generation
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
CHP on a hospital site
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2020-21 (T-1)
(and 2 more)
Battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Turbo Expander - for pressure reduction of incoming natural gas
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
-
• 2 x On-site turbo alternators
-
• 6 x On-site turbo alternators
-
• Power Recovery Train
Inactive -
2019-20 (T-1)
Gas Turbine CHP (typhoon) SGT-100 rated 4.9MWe BABR-1_2
Inactive -
2019-20 (T-1)
-
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
(3)
-
• Diesel Reciprocating Generator, rated 1MWe nominal
-
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
(and 1 more)
-
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
(2)
-
• Steam Turbine
(2)
-
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
(and 1 more)
-
• 0.8 MWe Gas Powered Generation Unit
-
• 0.8 MWe Gas powered generator
Inactive -
2019-20 (T-1),
2018-19 (T-1)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Office site with behind the meter generation
(3)
-
• Office site with behind the meter back up generation
-
• Office site with behind the meter generation.
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …
(5)
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
On-site existing CHP generating unit
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
Industrial Gases production site. DSR provided through process interruption.
(5)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Battery storage
(2)
-
• Battery strorage unit
(2)
-
• Battery Storage
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
CHP and autogeneration
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Steam Driven Turbo Alternator 8G1 6,8 MWe
(2)
-
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
-
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
-
• ... and 1 more unique descriptions
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)