Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
(3)
41.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• Gas Turbine CHP GT001B
(2)
-
• Steam Turbine CHP
15.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Gas Turbine Cogeneration Unit GT3
(3)
14.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(3)
7.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP Engine 3.360MW
(3)
6.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
Gas Turbine CHP GT001A
(3)
5.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
2026 kW CHP unit
(3)
1.8 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
1 * 1.7MW diesel reciprocating engine
(3)
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1 * 1.7MW diesel reciprocating engine
(3)
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1 * 1.7MW diesel reciprocating engine
(3)
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1 * 1.7MW diesel reciprocating engine
(3)
1.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1.521 MW CHP unit
(3)
1.3 MW
Active -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
1.280MW CHP
(3)
1.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1280 KWe Combined Heat and Power unit.
(3)
1.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
EnerG 1000 CHP
(3)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
MTU - 8V400064 1.013MW
(3)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2022-23 (T-1)
(and 2 more)
EnerG 1000 CHP
(3)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
E1000 CHP
(3)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
E1000 CHP unit
(3)
0.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Battery Storage
(3)
0.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage
(3)
0.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
On-site existing CHP generating unit
(3)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
Office site with behind the meter generation
(3)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Industrial Gases production site. DSR provided through process interruption.
(3)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(3)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Turbo Expander - for pressure reduction of incoming natural gas
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
On-site existing CHP generating unit
(3)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Industrial Gases production processes. DSR delivered through process interruption
(3)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
On-site existing CHP generating unit
(3)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Industrial Gases production processes. DSR delivered through process interruption
(3)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
Distribution Centre with behind the meter back-up generation.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
1.9 MW Gas gen ENER-G 1999
(3)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
On-site existing CHP generating unit
(3)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 2 more)
Office site with behind the meter back-up generation.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
On-site existing CHP generating unit
(3)
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
CHP and autogeneration
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Gas Engine
-
• Gas engine
-
• Gas turbine generator
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 2 more)
Offsite with behind the meter generation
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(3)
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Industrial Gases production processes. DSR delivered through process interruption
(3)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
1.166MW CHP
Inactive -
2021-22 (T-1)
-
• Office site with behind the meter back-up generation
(2)
-
• Office site with behind the meter back-up generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
CHP on a hospital site
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2020-21 (T-1)
(and 2 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Steam Turbine
(2)
-
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
(and 1 more)
-
• Battery storage
(2)
-
• Battery strorage unit
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
-
• Steam Driven Turbo Alternator 8G1 6,8 MWe
-
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Industrial Gases production processes. DSR delivered through process interruption
(3)
Active -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)