Search Map View Statistics Support Us Help Login Register

CENTRICA DISTRIBUTED GENERATION LIMITED

6 unique locations 14 components Page 1 of 1
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker (3)

Reciprocating engines
90.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

Reciprocating engines
38.1 MW
Active - 2026-27 (T-4)
Felindre Road, Pencoed, Brigend, CF35 5HU (1 components)

New build 40MW gas Peaker plant

Reciprocating engines
37.2 MW
Active - 2025-26 (T-1)
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (3 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Forth Drove, Peterborough PE1 5NT (3 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)
  • • A Prospective New Build Gas reciprocating energy reserve facility (4)
  • • Gas reciprocating energy reserve facility
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Active - 2024-25 (T-4), 2023-24 (T-4), 2020-21 (T-4) (and 2 more)
Showing locations 1 - 6 of 6