-
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
(2)
-
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
65.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro …
-
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro …
-
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro …
43.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas Engine
(3)
39.6 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Earlstoun hydro power station - Unit 1, part of the Galloway hydroelectric scheme
(2)
-
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
25.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme
(2)
-
• Carsfad hydro power station - Unit 2, part of the Galloway hydroelectric scheme
21.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• 3 x 2MW OCGT gas reciprocating engines
-
• 4 x 2MW OCGT gas reciprocating engines
-
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
9.4 MW
Active -
2027-28 (T-4),
2021-22 (T-4),
2020-21 (T-4)
12-turbine wind farm located in Scotland with the installed capacity of 43.200MW
(3)
9.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
12-turbine wind farm located in Scotland with the installed capacity of 43.200MW
(2)
6.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
3.1 MW
Active -
2026-27 (T-4)
Drumjohn hydro power station - Unit 1, part of the Galloway hydroelectric scheme
(2)
2.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
0.1 MW
Active -
2028-29 (T-4)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Load drop
(2)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging on residential premises
(3)
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)