Home List View Map View Technologies Companies Support Us Help Login Register
Theme

ENERSYST LIMITED

5 unique locations 45 components Page 1 of 1
Map View
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (22 components)
  • • Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme (3)
  • • Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme (2)
Hydro
65.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (24 components)
  • • Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro … (2)
  • • Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro …
  • • Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro …
  • • ... and 1 more unique descriptions
Hydro
43.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Harmire Road, Barnard Castle, County Durham, DL12 8DT (14 components)

On-site existing CHP generating unit (5)

CHP and autogeneration Combined Heat and Power (CHP)
Active - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (3 components)
  • • A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)
  • • A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 components)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Open Cycle Gas Turbine (OCGT)
Inactive - 2022-23 (T-4)
Showing locations 1 - 5 of 5