Home List View Map View Technologies Companies Support Us Help Login Register
Theme

FLEXITRICITY LIMITED

416 unique locations 3331 components Page 1 of 9
Map View
Drakemyre, Dalry KA24 5JJ (18 components)
  • • Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
  • • Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
  • • One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
CHP and autogeneration Combined Heat and Power (CHP)
26.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 11 more)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)
  • • Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (6)
  • • Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (2)
  • • Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel … (2)
CHP and autogeneration Combined Heat and Power (CHP)
6.4 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (5)

CHP and autogeneration Combined Heat and Power (CHP)
5.6 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (5)

CHP and autogeneration Combined Heat and Power (CHP)
5.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (5)

CHP and autogeneration Combined Heat and Power (CHP)
4.7 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)
  • • Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market … (3)
  • • Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas (2)
Combined Heat and Power (CHP)
2.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 2 more)
Montgomery Road, Aberdeen AB24 2YA (14 components)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
CHP and autogeneration Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
  • • Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
  • • Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
CHP and autogeneration Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Dock Yard Rd, Ellesmere Port, CH65 4EG (7 components)
  • • BtM storage providing standby capacity (2)
  • • BtM storage/standby generation; non exporting (2)
  • • BtM storage as standby generation, non-exporting
DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Crowhurst Bridge, 62 Shrub Lane, Etchingham, TN19 7EB (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Pudding Lane Spalding, Lincs, PE11 3TJ (6 components)
  • • Load curtailment and standby generation (2)
  • • Load curtailment via standby generation (2)
  • • Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Pipers Way, Swindon, Wiltshire, SN38 1SN (5 components)
  • • Load curtailment & standby generation (2)
  • • Load reduction via on-site standby generation taking site load (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Riverside House, Main Street, Rotherham S60 1AE (5 components)

Load reduction and generation via standby assets (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Lyndon, West Bromwich, West Midlands B71 4HJ (5 components)
  • • Load curtailment on site via standby generation (2)
  • • Standby generation supporting load curtailment (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
3 Nutmeg Ln, London E14 2AX (5 components)

Load reduction on site supported by non-exporting standby generation. (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Paddington Green Campus, London, W2 1NB (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Kings Park Road, Moulton Park, Northampton, NN3 6NW (5 components)
  • • Load curtailment on site and standby generation (2)
  • • Load reduction on site via standby generation (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Portsmouth Rd, Frimley, Surrey GU16 7UJ (6 components)
  • • Standby generation (2)
  • • Standby generation sub-metered taking site load (2)
  • • Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Monument Road, Bicker, Lincolnshire PE20 3DJ (5 components)
  • • Load curtailment and standby generation (2)
  • • Load curtailment at site via standby generation (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Bankside 2 & 3, 90-100 Southwark Street, London, SE1 0SW (4 components)
  • • Standby generation DRUPs taking site load. No export (2)
  • • Standby generation DRUPS taking site load, non-exporting
DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Broom Road, Stone ST15 0TE (5 components)
  • • Load curtailment (2)
  • • Load reduction (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Unit 5 Brown Lane West, Leeds. LS12 6BF (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Harbour House, Marine Parade Dover Kent CT17 9BU (4 components)
  • • Sixteen POSGUs (standby diesel generators). (2)
  • • Multiple POSGUs (standby diesel generators).
DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
High Dike, Grantham NG32 3QD (4 components)

Load reduction on flexible electricity consuming processes (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Combe Park, Bath, BA1 3NG (5 components)
  • • Standby generation taking site load (2)
  • • Standby generation x 2 (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (5 components)
  • • Load curtailment via standby generation exporting excess (2)
  • • Load reduction on-site and standby generation (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (5 components)
  • • Load curtailment and standby generation (2)
  • • Mix of load curtailment and standby generation (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Windmill Hill Business Park, Swindon, SN5 6QR (5 components)
  • • Load curtailment and standby generation (2)
  • • Load reduction via standby generation taking onsite load (2)
DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (4 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR
Inactive - 2022-23 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Dunswell Road, Cottingham, Hull HU16 4JT (3 components)

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Park Lane Cottingham East Yorkshire HU16 5RX (3 components)

Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (3 components)

Standby generation (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (5 components)

2 POSGU (1.0MW and 0.6MW) (4)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (5 components)

2 x 0.8MW POSGU (standby generation). (4)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
Carr Industrial Estate, Doncaster, South Yorkshire, DN4 5JJ (5 components)

Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services (4)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (4 components)

Mix of load reduction and standby generation (3)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (4 components)

Mix of load reduction and standby generation (3)

DSR
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Bush Estate Penicuik EH26 0QA (3 components)

Mixture of load reduction and standby generation. (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Thearn Lane Woodmansey Beverley HU17 0SA (3 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Showing locations 1 - 50 of 416