-
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(6)
-
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(2)
-
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel …
(2)
6.4 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(5)
5.6 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
District heating implementation of two gas CHP engines with no auxilliary load
(5)
5.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Two CHP engines in horticultural environment with no auxilliary load
(5)
4.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market …
(3)
-
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
(2)
2.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 2 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• BtM storage providing standby capacity
(2)
-
• BtM storage/standby generation; non exporting
(2)
-
• BtM storage as standby generation, non-exporting
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment via standby generation
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment & standby generation
(2)
-
• Load reduction via on-site standby generation taking site load
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction and generation via standby assets
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment on site via standby generation
(2)
-
• Standby generation supporting load curtailment
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load reduction and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment on site and standby generation
(2)
-
• Load reduction on site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Standby generation
(2)
-
• Standby generation sub-metered taking site load
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment at site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Standby generation DRUPs taking site load. No export
(2)
-
• Standby generation DRUPS taking site load, non-exporting
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment
(2)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Sixteen POSGUs (standby diesel generators).
(2)
-
• Multiple POSGUs (standby diesel generators).
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on flexible electricity consuming processes
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Standby generation taking site load
(2)
-
• Standby generation x 2
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment via standby generation exporting excess
(2)
-
• Load reduction on-site and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Mix of load curtailment and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Combination of load curtailment and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load reduction via standby generation taking onsite load
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
Standby generation
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
2 POSGU (1.0MW and 0.6MW)
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
2 x 0.8MW POSGU (standby generation).
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
Mix of load reduction and standby generation
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load reduction and standby generation
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mixture of load reduction and standby generation.
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)