-
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• One of three CHP in a horticultural environment
(8)
-
• One of three CHP in a horticultural environment.
(8)
13.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• CHP at a horticultural environment.
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• CHP at horticultural site
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
(5)
4.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation
(4)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• ... and 1 more unique descriptions
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(4)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)