Home List View Map View Technologies Companies Support Us Help Login Register
Theme

FLEXITRICITY LIMITED

58 unique locations 549 components Page 1 of 2
Map View
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment. (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • CHP at horticultural site
CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (9)

CHP and autogeneration Combined Heat and Power (CHP)
8.7 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

Combined Heat and Power (CHP)
8.4 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 3 more)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)
  • • Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (6)
  • • Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (2)
  • • Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel … (2)
CHP and autogeneration Combined Heat and Power (CHP)
6.4 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (6)

CHP and autogeneration Combined Heat and Power (CHP)
6.0 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
  • • CHP engine in horticultural environment with no auxilliary load (3)
  • • Two CHP engines in horticultural environment with no auxilliary load (2)
CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (9)

CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (5)

CHP and autogeneration Combined Heat and Power (CHP)
5.6 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (5)

CHP and autogeneration Combined Heat and Power (CHP)
5.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

CHP and autogeneration Combined Heat and Power (CHP)
5.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (5)

Combined Heat and Power (CHP)
5.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 3 more)
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (5)

CHP and autogeneration Combined Heat and Power (CHP)
4.7 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)

One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load. (5)

CHP and autogeneration Combined Heat and Power (CHP)
3.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

CHP and autogeneration Combined Heat and Power (CHP)
3.5 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (5)

CHP and autogeneration Combined Heat and Power (CHP)
3.0 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 5 more)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (5)

CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Ashgrove Road West, Aberdeen AB16 5UL (14 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Beach Esplanade, Aberdeen AB24 5NR (9 components)

District heating implementation with one asset 1MW and no auxiliary load (5)

Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Montgomery Road, Aberdeen AB24 2YA (14 components)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
CHP and autogeneration Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (5)

CHP and autogeneration Combined Heat and Power (CHP)
2.1 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
  • • Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
  • • Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
CHP and autogeneration Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
  • • Two gas CHP engines in commercial horticultural environment with no auxilliary load (4)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP)
1.0 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Deansford Lane, DY10 4NB (12 components)

Load reduction on site supported by non-exporting standby generation. (10)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (12 components)

Load reduction on site supported by non-exporting standby generation. (5)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (12 components)

Load reduction on site supported by non-exporting standby generation. (5)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Neachley Ln, Shifnal TF11 8PQ (12 components)

Load reduction on site supported by non-exporting standby generation. (10)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (19 components)

load curtailment at site (5)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Saltend Lane, HULL, HU12 8PP (23 components)
  • • Load reduction (3)
  • • Load reduction on site (2)
DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Reciprocating engines
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
  • • A standby diesel generator on a waster water treatment works. (3)
  • • A standby diesel generator on a waste water treatment works. (2)
DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-4) (and 6 more)
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity … (5)

CHP and autogeneration Combined Heat and Power (CHP)
Active - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load. (3)

Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-4) (and 1 more)
Dock Yard Rd, Ellesmere Port, CH65 4EG (7 components)
  • • BtM storage providing standby capacity (2)
  • • BtM storage/standby generation; non exporting (2)
  • • BtM storage as standby generation, non-exporting
DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
  • • New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements. (2)
  • • New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
  • • Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (2)
  • • Load curtailment
DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4)
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (5)

CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 5 more)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)
  • • Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)
  • • Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas (2)
CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Reciprocating engines
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Cairnton Road, Boyndie, Banffshire, AB45 2LR (7 components)
  • • Standby diesel generator that reduces site load when generating. (2)
  • • Standby generation (2)
  • • Standby generation from a POSGU.
DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 2 more)
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
  • • Load drop by on-site generation (3)
  • • Load drop
DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (9 components)

Two gas CHP in a horticultural environment with no aux load (5)

CHP and autogeneration Combined Heat and Power (CHP)
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 6 more)
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)
  • • Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation. (4)
  • • Load drop.
DSR
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 4 more)
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (8 components)
  • • Load reduction on flexible electricity consuming processes (4)
  • • Load drop
DSR
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 4 more)
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (8 components)

Load reduction on site supported by non-exporting standby generation. (5)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-4) (and 4 more)
Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation. (7)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (7 components)
  • • Load reduction (3)
  • • Load shedding (2)
DSR
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 3 more)
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (8 components)
  • • Load reduction on flexible electricity consuming processes (4)
  • • Load drop
DSR
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 4 more)
Showing locations 1 - 50 of 58