• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• 6 CHP engines horticultural environment with no auxiliiary load
(4)
-
• Two of six CHP engines horticultural environment with no auxiliiary load
13.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 6 more)
-
• 2MW gas CHP engine in a horticultural environment
(2)
-
• One 2MW gas CHP engine in a horticultural environment
(2)
-
• One 1.5 MW gas CHP engine in a horticultural environment
10.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CHP at a horticultural environment.
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• CHP at horticultural site
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
(9)
8.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(6)
-
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(2)
-
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel …
(2)
6.4 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Two CHP gas engines in commercial horticultural environment with no auxilliary load
(6)
6.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• CHP engine in horticultural environment with no auxilliary load
(3)
-
• Two CHP engines in horticultural environment with no auxilliary load
(2)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
CHP engine in a horticultural environment, natural gas, no aux load
(9)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(5)
5.6 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
District heating implementation of two gas CHP engines with no auxilliary load
(5)
5.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Two CHP engines in horticultural environment with no auxilliary load
(5)
4.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
(5)
3.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
3.5 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One CHP engine in a horticultural environment with no auxilliary load.
(5)
3.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1MW and no auxiliary load
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.1 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(4)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load reduction and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load reduction on site supported by non-exporting standby generation.
(2)
-
• Load reduction on site supported by standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• Load curtailment on site and standby generation
(2)
-
• Load reduction on site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Two gas turbines (CX501-KB7) rated at 5.3MW each.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
CHP generator exporting to private wire network at the University of Glasgow.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Standby generation
(2)
-
• Standby generation sub-metered taking site load
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment at site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Standby generation DRUPs taking site load. No export
(2)
-
• Standby generation DRUPS taking site load, non-exporting
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• CHP generating for site load, which exceeds generating capacity. No aux load.
(2)
-
• CHP generating in NHS hospital. No aux load.
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• Load curtailment
(2)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Gas generation peaking plant comprising of 9 x 2MW engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
(2)
-
• CHP generating in NHS hospital. No aux load.
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
-
• Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
CHP generating for site load, which exceeds generating capacity. No aux load.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Sixteen POSGUs (standby diesel generators).
(2)
-
• Multiple POSGUs (standby diesel generators).
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on flexible electricity consuming processes
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load curtailment and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)