• 6 CHP engines horticultural environment with no auxiliiary load
(4)
-
• Two of six CHP engines horticultural environment with no auxiliiary load
13.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 6 more)
-
• 2MW gas CHP engine in a horticultural environment
(2)
-
• One 2MW gas CHP engine in a horticultural environment
(2)
-
• One 1.5 MW gas CHP engine in a horticultural environment
10.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CHP at a horticultural environment.
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• CHP at horticultural site
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
(9)
8.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(6)
-
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(2)
-
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel …
(2)
6.4 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Two CHP gas engines in commercial horticultural environment with no auxilliary load
(6)
6.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
CHP engine in a horticultural environment, natural gas, no aux load
(9)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• CHP engine in horticultural environment with no auxilliary load
(3)
-
• Two CHP engines in horticultural environment with no auxilliary load
(2)
5.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(5)
5.6 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
District heating implementation of two gas CHP engines with no auxilliary load
(5)
5.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Two CHP engines in horticultural environment with no auxilliary load
(5)
4.7 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
(5)
4.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
(5)
3.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
3.5 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One CHP engine in a horticultural environment with no auxilliary load.
(5)
3.0 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1MW and no auxiliary load
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.1 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(4)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(7)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Load reduction on flexible electricity consuming processes
(4)
-
• Load drop
Active -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
(2)
Active -
2024-25 (T-4),
2023-24 (T-4)
-
• Load drop by on-site generation
(3)
-
• Load drop
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
2No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
(2)
Active -
2024-25 (T-4),
2023-24 (T-4)
-
• Standby diesel generator that reduces site load when generating.
(2)
-
• Standby generation
(2)
-
• Standby generation from a POSGU.
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
(3)
-
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
One CHP, generating for site load which exceeds generating capacity. No aux load.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
(2)
-
• Load curtailment
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
-
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
(2)
-
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• BtM storage providing standby capacity
(2)
-
• BtM storage/standby generation; non exporting
(2)
-
• BtM storage as standby generation, non-exporting
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Two CHP, generating for site load which exceeds generating capacity. No aux load.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• Load reduction
(3)
-
• Load reduction on site
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
load curtailment at site
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
load curtailment at site
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
(2)
-
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
(2)
-
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• A standby diesel generator on a waster water treatment works.
(3)
-
• A standby diesel generator on a waste water treatment works.
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 6 more)
The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …
(5)
Active -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)