• One of three CHP in a horticultural environment
(8)
-
• One of three CHP in a horticultural environment.
(8)
13.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• 6 CHP engines horticultural environment with no auxiliiary load
(4)
-
• Two of six CHP engines horticultural environment with no auxiliiary load
13.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 6 more)
-
• 2MW gas CHP engine in a horticultural environment
(2)
-
• One 2MW gas CHP engine in a horticultural environment
(2)
-
• One 1.5 MW gas CHP engine in a horticultural environment
10.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CHP at a horticultural environment.
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• CHP at horticultural site
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
8.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 3 more)
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
one CHP (1.9MW rating) in a horticulatural environment with no aux load
(5)
5.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
(5)
4.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
(5)
3.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
3.5 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation with one asset 1MW and no auxiliary load
(5)
2.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.1 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
One 2MW gas CHP engine in a horticultural environment
(3)
1.8 MW
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(4)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Active -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Front of the Meter battery storage asset located in Devon.
(4)
1.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(7)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
load curtailment at site
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Standby generation
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Load reduction on site supported by standby generation
(4)
-
• Standby generation reducing load
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 3 more)
load curtailment at site
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A standby diesel generator on a waster water treatment works.
(3)
-
• A standby diesel generator on a waste water treatment works.
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Load reduction
(3)
-
• Load reduction on site
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)