Load curtailment from refridgeration
Active -
2028-29 (T-4)
Load reduction
(5)
Inactive -
2022-23 (T-3),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
Load reduction
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Load drop at large Industrial cold storage
Inactive -
2020-21 (T-4)
-
• Load reduction.
(3)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Load drop at large industrial cold storage
Inactive -
2020-21 (T-4)
Load drop at large Industrial cold storage
Inactive -
2020-21 (T-4)
-
• Load reduction
(3)
-
• Load shedding
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load drop by on-site generation
(3)
-
• Load drop
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Standby generation, submetered, taking site load
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-4),
2021-22 (T-4)
(and 4 more)
-
• Standby diesel generator that reduces site load when generating.
(2)
-
• Standby generation
(2)
-
• Standby generation from a POSGU.
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
(3)
-
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Front of the Meter battery storage asset located in Devon.
Inactive -
2023-24 (T-1)
One CHP, generating for site load which exceeds generating capacity. No aux load.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
(2)
-
• Load curtailment
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
-
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
(2)
-
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• BtM storage providing standby capacity
(2)
-
• BtM storage/standby generation; non exporting
(2)
-
• BtM storage as standby generation, non-exporting
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Two CHP, generating for site load which exceeds generating capacity. No aux load.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
Lithium ion battery operating as a power plant. Change of use from redundant quarry.
Inactive -
2022-23 (T-4)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
CHP generating for site load, which exceeds generating capacity. No aux load.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment via standby generation
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment & standby generation
(2)
-
• Load reduction via on-site standby generation taking site load
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction and generation via standby assets
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load reduction
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Combination of load curtailment and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
CHP exporting to a private wire network in a manufacturing environment.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Load curtailment on site via standby generation
(2)
-
• Standby generation supporting load curtailment
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …
Inactive -
2022-23 (T-4)
Load reduction on site supported by non-exporting standby generation.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load reduction and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load reduction on site supported by non-exporting standby generation.
(2)
-
• Load reduction on site supported by standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• Load curtailment on site and standby generation
(2)
-
• Load reduction on site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Two gas turbines (CX501-KB7) rated at 5.3MW each.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
CHP generator exporting to private wire network at the University of Glasgow.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Standby generation
(2)
-
• Standby generation sub-metered taking site load
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment at site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Standby generation DRUPs taking site load. No export
(2)
-
• Standby generation DRUPS taking site load, non-exporting
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• CHP generating for site load, which exceeds generating capacity. No aux load.
(2)
-
• CHP generating in NHS hospital. No aux load.
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• Load curtailment
(2)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Gas generation peaking plant comprising of 9 x 2MW engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)