• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection …
(3)
-
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
(2)
4.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity …
(3)
-
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
(2)
4.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection …
(3)
-
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
(2)
3.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. …
(3)
-
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
(2)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is …
(3)
-
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as …
(3)
-
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is …
(3)
-
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection …
(3)
-
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. …
(3)
-
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
0.400MW of battery storage located at Stratford-Upon-Avon.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
19.500 MW of battery storage located at Hereford.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Advanced battery energy storage system
-
• New Build Generation CMU, advanced battery energy storage system
Inactive -
2021-22 (T-4),
2019-20 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Active -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Active -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.
Inactive -
2020-21 (T-4)
1.200MW of battery storage located at Durham.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Purpose Build Battery designed to be compliant in the FFR market.
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
1.200MW of battery storage located at Stockton-on-Tees.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Durham.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
0.800MW of battery storage located at Wiltshire.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Preston.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Hook.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Preston.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
20.000MW of battery storage located at Lascar Works
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
20.000 MW of battery storage located at Macclesfield.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
1.000MW of battery storage located at Staffordshire.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Westoning.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)