14.710 MW CHP generation
(5)
13.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …
(4)
10.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• 8.300MW Gas Turbine installation
(3)
-
• 8.3MW Gas Turbine installation
(2)
7.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
3.350 MW gas engine CHP plant
(5)
3.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
1 MW CHP generation
(5)
0.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
1.200MW BESS
(3)
0.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
1.200 MW battery storage
(3)
0.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
29MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
4.365MW Demand reduction at Johnstone 2 Bus Depot
Inactive -
2023-24 (T-4)
Battery Energy Storage System
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 4MW of DSR
(3)
-
• 1 x 800kW/1100KWh Lithium Ion Battery
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
6MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
2.6MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
19 MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
4MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
-
• 1.800 MW CHP generation
(3)
-
• 1.8 MW CHP generation
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
0.4MW demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
4MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 0.6MW of turn down
(2)
-
• 4MW of DSR
(2)
-
• Turn down component
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 2MW of DSR
(3)
-
• 0.250 MW of demand reduction
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
2MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1000kW/1200kWh Lithium Ion Battery
(2)
Inactive -
2020-21 (T-4),
2017-18 (T-1)
0.5 MW diesel gensets
Inactive -
2020-21 (T-4)
5MW of demand reduction
Inactive -
2022-23 (T-4)
0.27MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5MW of demand reduction
Inactive -
2022-23 (T-4)
4 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
2 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
1.6MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 5 MW of demand reduction
(3)
-
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
5MW of demand reduction
Inactive -
2022-23 (T-4)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• 0.15MW of demand reduction
(3)
-
• 10 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Hanson site demand reduction for Ketton
Inactive -
2022-23 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 2.6MW of demand reduction
(2)
-
• Turn down CMU
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2017-18 (TR)
03MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.8 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
2MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.45MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.3MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.194 MW CHP generation
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.2MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
0.29MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• 0.4MW demand reduction
(2)
-
• Turn down of 11kv connection
Inactive -
2022-23 (T-4),
2019-20 (T-1),
2017-18 (TR)
5 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)