PIVOTED POWER LLP

21 unique locations 38 components Page 1 of 1
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 4h)
23.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h)
19.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h)
16.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 3.5h)
15.5 MW
Active - 2025-26 (T-1)
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
15.2 MW
Active - 2027-28 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
9.0 MW
Active - 2026-27 (T-4)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
9.0 MW
Active - 2026-27 (T-4)
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
8.0 MW
Active - 2026-27 (T-4)
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 8.5h)
8.0 MW
Active - 2028-29 (T-4)
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
7.6 MW
Active - 2026-27 (T-4)
Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 8.5h)
6.8 MW
Active - 2028-29 (T-4)
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
6.5 MW
Active - 2027-28 (T-4)
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h)
5.7 MW
Active - 2027-28 (T-4)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Active - 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Inactive - 2023-24 (T-1)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Active - 2024-25 (T-4)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h)
Inactive - 2023-24 (T-1)
Showing locations 1 - 21 of 21