Plutus Energy LTD

64 unique locations 279 components Page 1 of 2
Map View
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Drax Power Station Drax Selby YO8 8PH (8 components)
  • • Unit 1 fuelled by Biomass at Drax Power Station
  • • Unit 2 fuelled by Biomass at Drax Power Station
  • • Unit 3 fuelled by Biomass at Drax Power Station
Biomass
2238.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
  • • A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Coal Coal/biomass Open Cycle Gas Turbine (OCGT)
268.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h)
107.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
  • • Battery energy storage unit (2)
  • • Battery storage unit
Storage (Duration 2h)
29.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Selby, North Yorkshire, YO8 6PG (2 components)
  • • A 40MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h)
25.1 MW
Active - 2028-29 (T-4)
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 components)

New Build Battery Storage Facility

Storage (Duration 4h)
16.7 MW
Active - 2028-29 (T-4)
Denison road, Selby, North Yorkshire, YO8 8AN. (8 components)

Gas Turbine Cogeneration Unit GT3 (3)

Combined Heat and Power (CHP)
14.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (3)

CHP and autogeneration Combined Heat and Power (CHP)
7.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
HOLME CLOSE SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HILLAM ROAD GATEFORTH SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
FOXGLOVE WAY HAMBLETON SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATERSIDE HEMINGBROUGH SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
LEEDS ROAD SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WHITE GARTH BUBWITH SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HIGHFIELD CRESCENT BARLBY SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Spring Walk Selby North Yorkshire YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SELBY LANE KEYWORTH NOTTINGHAM NG12 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WOOD LANE THORPE WILLOUGHBY SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
FARRIER CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
DYON WAY BUBWITH SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
HOWARD CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Westbourne Road Selby YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
OAKLANDS CAMBLESFORTH SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Westcroft Lane Hambleton Selby YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
ABBOTS MEWS SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
York Road Cliffe Selby YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Sherwood Drive Thorpe Willoughby Selby North Yorkshire YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WEST PARK SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
OAK FIELD BRAYTON SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Mayfield Drive Brayton Selby YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
YORK ROAD NORTH DUFFIELD SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
RICHARDSON COURT HAMBLETON SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
VIEW NORTH DUFFIELD SELBY YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Bay Street Thorpe Willoughby SELBY North Yorkshire YO8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Main Road, North Yorkshire, Selby, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
LODGE DYON LANE, SOUTH DUFFIELD, SELBY, YO8 (4 components)

EV charging on residential premises (3)

DSR
Active - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Selbie Drive, Inverurie, AB51 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Hobby Way, Selby, North Yorkshire, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Spring Walk, Brayton, Selby, North Yorkshire, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Bridle Walk, Selby, North Yorkshire, YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
The Green, Wistow, Selby, North Yorkshire , YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Wavell Street, Selby, Yorkshire , YO8 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Hales Lane Drax Selby YO8 8PL (1 components)

A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane

Storage (Duration 1h)
Active - 2025-26 (T-4)
Drax Power Station, Drax, Selby, YO8 8PH (20 components)

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (3)

Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Olympia Mills, Barlby Rd, Selby YO8 5AF multisite (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

DSR
Active - 2026-27 (T-4), 2023-24 (T-1)
Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
BAFFAM COURT BAFFAM LANE BRAYTON SELBY YO8 (1 components)

EV charging at residential premises

DSR
Inactive - 2023-24 (T-1)
Drax Power Station, Selby, YO8 8PH (1 components)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Combined Cycle Gas Turbine (CCGT)
Inactive - 2023-24 (T-4)
Showing locations 1 - 50 of 64