Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Inactive -
2023-24 (T-4)
EV charging at residential premises
Inactive -
2023-24 (T-1)
The CMU component at Rusholme Grange is an energy storage system comprised of Lithium-ion batteries. The system will have a 35 MW export capacity and an import capacity of 36.8 …
Inactive -
2021-22 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2021-22 (T-4)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
-
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 110 …
-
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive -
2020-21 (T-4)
Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive -
2020-21 (T-4)
A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane
Active -
2025-26 (T-4)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active -
2025-26 (T-1)
EV charging at residential premises
Inactive -
2023-24 (T-1)
-
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
(8)
-
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
(2)
-
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
(2)
-
• ... and 1 more unique descriptions
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging on residential premises
(4)
Active -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)