SSE Generation Limited

7 unique locations 39 components Page 1 of 1
Map View
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)
  • • Peterhead CCGT (9)
  • • Peterhead 1
  • • Peterhead 1 for Delivery Year 2017/18 only
  • • ... and 1 more unique descriptions
Combined Cycle Gas Turbine (CCGT)
3242.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (13 components)
  • • 1 x hydro turbine & synchronous generator (4)
  • • 1x hydro turbine & synchronous generator
Hydro
47.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (10 components)
  • • Generating Unit 1 (3)
  • • Generating Unit 2
  • • Generating Unit 3
Hydro
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (8 components)
  • • Generating Unit 1 (3)
  • • Generating Unit 2 (2)
Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Fasnaykyle Power Station, Cannich, Inverness-shire, IV4 7NB (12 components)
  • • Post-refurbishment generating unit 1
  • • Post-refurbishment generating unit 2
  • • Post-refurbishment generating unit 3
  • • ... and 2 more unique descriptions
Inactive - 2020-21 (T-4), 2017-18 (T-1)
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (12 components)
  • • 1 x hydro turbine & synchronous generator (2)
  • • Genset 2 (2)
  • • Genset 3
Hydro
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Lochay Power Station, Killin, Perthshire, FK21 8UA (5 components)
  • • Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU. (2)
  • • Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU. (2)
  • • ROCable hydro units within the BMU are not included in the CMU. For Delivery Year 2017/18 only.
Hydro
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)