Search Map View Statistics Support Us Help Login Register

TATA STEEL UK LIMITED

11 unique locations 158 components Page 1 of 1
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant (5)

Coal/biomass Energy from Waste
18.9 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)
  • • Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as … (3)
  • • 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA (2)
Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (2 components)

Industrial process within the Tata Steel estate - specific installations TBC (2)

DSR
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Carlton,Stockton-On-Tees,TS21 1EA (3 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (5 components)
  • • Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( … (3)
  • • Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business …
DSR
Inactive - 2019-20 (T-1), 2018-19 (T-1), 2017-18 (TR) (and 1 more)
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (2 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive - 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD (130 components)

Manufacturing site providing demand response (5)

DSR
Active - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-4) (and 7 more)
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (17 components)
  • • Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
  • • Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
  • • Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
DSR
Active - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-4) (and 7 more)
Port Talbot, Port Talbot Works, SA13 2NG (6 components)
  • • Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines ) (4)
  • • Site based CHP - note the primary fuel are Waste Gases
Reciprocating engines Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2023-24 (T-1), 2022-23 (T-3) (and 3 more)
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Energy from Waste
Inactive - 2023-24 (T-1)
Showing locations 1 - 11 of 11