Home List View Map View Technologies Companies Support Us Help Login Register
Theme

VITAL ENERGI SOLUTIONS LIMITED

4 unique locations 33 components Page 1 of 1
Map View
Imperial College London, South Kensington Campus, SW7 2AZ (18 components)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 1). (3)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 2). (2)
Combined Heat and Power (CHP)
12.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
  • • VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU. (4)
  • • New 4.5MW CHP at Oxford Hospital
CHP and autogeneration Combined Heat and Power (CHP)
4.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 3 more)
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (6 components)
  • • VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (3)
  • • VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP)
3.0 MW
Active - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (6 components)

A 3.36MW gas fired reciprocating engine CHP. (4)

Combined Heat and Power (CHP)
3.0 MW
Active - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Showing locations 1 - 4 of 4