• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
(3)
-
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
(2)
90.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …
(5)
78.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(5)
21.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing hot water to an industrial unit
(5)
1.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
(8)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Water pumping station comprising of electrical pumps that can be modulated or turned off.
Inactive -
2022-23 (T-4)
Combination of load curtailment and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
A gas engine CHP site providing hot water to agricultural greenhouses
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …
(3)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
-
• A standby diesel generator on a waster water treatment works.
(3)
-
• A standby diesel generator on a waste water treatment works.
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 6 more)
A new power plant, with associated civil works, switchgear and electrical connection.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
2 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• Gas fired generating unit(s)
-
• Gas fired generating units
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Mix of load reduction and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP …
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
A gas engine CHP site providing hot water to agricultural greenhouses
Inactive -
2022-23 (T-4)
3 MW of demand reduction
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Gas fired reciprocating engines.
Inactive -
2022-23 (T-4)