Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …
(5)
78.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(5)
21.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Existing Generation on existing site - CHP
(5)
14.8 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A site with two gas engine CHPs, providing hot water to a local district heating network
(4)
-
• A site with two gas engine CHPs providing hot water to a local district heating network
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
(5)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to an industrial unit
(5)
1.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
(8)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(5)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(3)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Water Source Heat Pumps at 1748KW each (x2)
(2)
-
• Water source heat pumps at 1748kW each
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(4)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)