CBS ENERGY STORAGE ASSETS UK LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for CBS ENERGY STORAGE ASSETS UK LIMITED
Found 21 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-21 of 21.
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
Open Cycle Gas Turbine (OCGT)
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRG19
2019-20 (T-1)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
None
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRGG2
2017-18 (T-1)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
OCGT and Reciprocating Engines (Fuel Type - Gas)
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRGG3
2021-22 (T-4)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
OCGT and Reciprocating Engines (Fuel Type - Gas)
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRGG3
2018-19 (T-1)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
None
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRGG2
2020-21 (T-4)
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT.
Open Cycle Gas Turbine (OCGT)
- Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
CMU: EBRG19
2022-23 (T-4)
Farburn?Place, Dyce, Aberdeen, AB21 7GP
Storage (Duration 2h)
- Battery Storage 2 hour duration
7.09 MW
CMU: 8RES31
2026-27 (T-4)
Farburn?Place, Dyce, Aberdeen, AB21 7GP
Storage (Duration 2h)
- Battery Storage 2 hour duration
CMU: 9RES02
2024-25 (T-1)
Greenfield site, Stainton, Rotherham, S66 7RQ
Storage (Duration 2h)
- Battery Storage 2 hour duration
18.90 MW
CMU: 8RES47
2026-27 (T-4)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF
Storage (Duration 2.5h)
- A 28MW new build of battery storage unit.
7.31 MW
CMU: 10REAA
2028-29 (T-4)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF
Storage (Duration 2.5h)
- A 28MW new build of battery storage unit.
9.51 MW
CMU: 10REAA
2025-26 (T-1)
Malton Road, Malton YO17 8JF
Storage (Duration 2h)
- A 40MW new build of battery storage unit.
6.16 MW
CMU: 9RES06
2027-28 (T-4)
Newburth, Perth, Scotland, KY14 6EW
Storage (Duration 2h)
- Storage battery 2h duration
13.61 MW
CMU: 10REAB
2028-29 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ
None
- A Prospective New Build Battery Storage facility
CMU: EFR-RO
2020-21 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ
Storage
- A Prospective New Build Battery Storage facility
CMU: EFRRO3
2018-19 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ
Storage (Duration 0.5h)
- A Prospective New Build Battery Storage facility
CMU: EFRR19
2019-20 (T-1)
Scawby Brook, Brigg, Lincolnshire DN20 9LT
Reciprocating engines
- A Prospective New Build Gas reciprocating energy reserve facility
CMU: 5RES41
2023-24 (T-4)
Scawby Brook, Brigg, Lincolnshire DN20 9LT
Reciprocating engines
- A Prospective New Build Gas reciprocating energy reserve facility
CMU: 6RES5B
2024-25 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT.
Storage (Duration 2h)
- Brigg Battery 2 hour duration
CMU: 7RES31
2025-26 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT.
Storage (Duration 2h)
- Brigg Battery 2 hour duration
9.78 MW
CMU: 10RE31
2028-29 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT.
Storage (Duration 2h)
- Brigg Battery 2 hour duration
CMU: 9RES01
2024-25 (T-1)
Data fetch time: 0.576s