DAMSONGREEN ENERGYFARM LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for DAMSONGREEN ENERGYFARM LIMITED
Found 4 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-4 of 4.
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH
Storage (Duration 2h)
- The CMU is a electro-chemical battery storage system connected to the transmission system at the Na…
CMU: PPBF23
2024-25 (T-1)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH
Storage (Duration 2h)
- The CMU is a electro-chemical battery storage system connected to the transmission system at the Na…
8.98 MW
CMU: PPBF22
2026-27 (T-4)
Land to the North of Tye Lane, Ipswich, IP8 4NP
Solar Photovoltaic
- CMU is a photovoltaic system
1.04 MW
CMU: TYEL24
2025-26 (T-1)
Land to the North of Tye Lane, Ipswich, IP8 4NP
Solar Photovoltaic
- CMU is a photovoltaic system
1.19 MW
CMU: TYEL24
2028-29 (T-4)
Data fetch time: 0.350s