E.ON UK Plc
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for E.ON UK Plc
Found 611 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 401-450 of 611.
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ
DSR
- DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
CMU: DSR152
2028-29 (T-4)
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ
DSR
- Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce…
CMU: DS1805
2018-19 (T-1)
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ
DSR
- Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce…
CMU: DS1805
2021-22 (T-4)
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ
DSR
- DSR Component providing load turndown at a steel melting facility with electric arc furnaces
CMU: DSR071
2023-24 (T-4)
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ
DSR
- DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
CMU: DSR144
2027-28 (T-4)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY
Combined Heat and Power (CHP)
- Gas Fired CHP
2.93 MW
CMU: SON002
2027-28 (T-4)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY
Combined Heat and Power (CHP)
- Gas Fired CHP
CMU: SON001
2023-24 (T-1)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY
Combined Heat and Power (CHP)
- Gas Fired CHP
2.92 MW
CMU: SON001
2026-27 (T-4)
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11
DSR
- EV charging at residential premises
CMU: SAND-1
2024-25 (T-1)
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11
DSR
- EV charging at residential premises
CMU: SAND-1
2023-24 (T-1)
TBC
DSR
- TBC
CMU: DSR132
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR129
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR162
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR120
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR119
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR118
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR117
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR150
2027-28 (T-4)
TBC
DSR
- TBC
CMU: DSR161
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR160
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR131
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR159
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR158
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR157
2028-29 (T-4)
TBC
DSR
- TBC
CMU: DSR116
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR130
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR149
2027-28 (T-4)
TBC
DSR
- TBC
CMU: DSR136
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR112
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR135
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR128
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR127
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR126
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR133
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR109
2025-26 (T-4)
TBC
DSR
- TBC
CMU: ABA001
2023-24 (T-1)
TBC
DSR
- TBC
CMU: DSR108
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR138
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR137
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR115
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR134
2026-27 (T-4)
TBC
DSR
- TBC
CMU: DSR113
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR114
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR111
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR151
2024-25 (T-1)
TBC
DSR
- TBC
CMU: DSR110
2025-26 (T-4)
TBC
DSR
- TBC
CMU: DSR151
2027-28 (T-4)
TBC
DSR
- TBC
CMU: DSR150
2024-25 (T-1)
TBC
DSR
- TBC
CMU: CELS23
2023-24 (T-1)
The Billingham Synthetic Plant Haverton Hill Road Billingham TS23 1PY
CHP and autogeneration
- The turbo alternator at the Billingham site
CMU: DS1821
2018-19 (T-1)
First
Previous
1
2
3
4
...
12
13
Next
Last
Data fetch time: 0.578s