Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP
Storage (Duration 9h)
- New build BESS to be installed within a future Greener Grid Park.
11.32 MW
CMU: FECB-1
2027-28 (T-4)
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP
Storage (Duration 6h)
- New build BESS to be installed within a future Greener Grid Park.
34.59 MW
CMU: FECB-2
2028-29 (T-4)