PINXTON ENERGY LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for PINXTON ENERGY LIMITED
Found 5 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-5 of 5.
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW
OCGT and Reciprocating Engines (Fuel Type - Gas)
- NEW BUILD GAS GENERATION STATION
CMU: TWI111
2021-22 (T-4)
Ty Coch Farm Greenfield Holywell CH87HT
Open Cycle Gas Turbine (OCGT)
- Gas fuelled generation plant
CMU: PIN222
2023-24 (T-4)
Ty Coch Farm Greenfield Holywell CH87HT
Open Cycle Gas Turbine (OCGT)
- Gas fuelled generation plant
CMU: PIN222
2024-25 (T-4)
Ty Coch Farm Greenfield Holywell CH87HT
Open Cycle Gas Turbine (OCGT)
- Gas fuelled generation plant
CMU: PIN222
2022-23 (T-3)
Ty Coch Farm Greenfield Holywell CH87HT
Open Cycle Gas Turbine (OCGT)
- Gas fuelled generation plant
CMU: PIN111
2022-23 (T-4)
Data fetch time: 0.354s