PULSE CLEAN ENERGY SPV CAVENDISH LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for PULSE CLEAN ENERGY SPV CAVENDISH LIMITED
Found 4 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-4 of 4.
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL
Storage (Duration 2h)
- New Build 2 hour battery storage system.
CMU: CO2023
2024-25 (T-1)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL
Storage (Duration 2.5h)
- New Build 2.5 hour battery storage system.
9.08 MW
CMU: CO2023
2025-26 (T-1)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL
Storage (Duration 2h)
- Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity f…
4.73 MW
CMU: EL0061
2026-27 (T-4)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL
Storage (Duration 2h)
- Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity f…
2.36 MW
CMU: EL0062
2026-27 (T-4)
Data fetch time: 0.573s