WHITETOWER ENERGY LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for WHITETOWER ENERGY LIMITED
Found 67 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-50 of 67.
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: BRIST2
2017-18 (T-1)
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: BRISTa
2020-21 (T-4)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
CMU: THRN02
2024-25 (T-4)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
CMU: THRN02
2021-22 (T-1)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
CMU: THRN25
2025-26 (T-4)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
CMU: THRN25
2022-23 (T-1)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
CMU: THRN26
2023-24 (T-1)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
37.22 MW
CMU: THRN28
2028-29 (T-4)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
38.19 MW
CMU: THRN27
2027-28 (T-4)
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA.
Open Cycle Gas Turbine (OCGT)
- Small gas fired OCGT.
37.24 MW
CMU: THRN26
2026-27 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: VKING4
2023-24 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: VKING4
2022-23 (T-3)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Reciprocating engines
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: VKING3
2022-23 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
43.79 MW
CMU: VKIN28
2028-29 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
39.93 MW
CMU: VKIN27
2027-28 (T-4)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Clevela…
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
43.36 MW
CMU: VKIN26
2026-27 (T-4)
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Clev…
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: VKING2
2017-18 (T-1)
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Clev…
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: VKINGa
2020-21 (T-4)
Factory Lane Croydon Surrey CR0 3LE
Reciprocating engines
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: CROYD3
2022-23 (T-4)
Factory Lane, Croydon, Surrey, CR0 3LE
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: CROYD2
2017-18 (T-1)
Factory Lane, Croydon, Surrey, CR0 3LE
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: CROYDa
2020-21 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
CMU: CROYD4
2022-23 (T-3)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
CMU: CROYD4
2023-24 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
CMU: CROY24
2024-25 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
CMU: CROY25
2025-26 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
43.53 MW
CMU: CROY26
2026-27 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
42.21 MW
CMU: CROY28
2028-29 (T-4)
Factory Lane Croydon Surrey CR0 3RL
Open Cycle Gas Turbine (OCGT)
- Existing OCGT.
45.56 MW
CMU: CROY27
2027-28 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEAR4a
2023-24 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEAR4a
2022-23 (T-3)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEAR4b
2023-24 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEAR4b
2022-23 (T-3)
Fort Parkway Heartlands Birmingham B24 9QT
Reciprocating engines
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEAR3a
2022-23 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Reciprocating engines
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEAR3b
2022-23 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEA24a
2024-25 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEA24b
2024-25 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEA25a
2025-26 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
CMU: HEA25b
2025-26 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
45.07 MW
CMU: HEA26a
2026-27 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
42.16 MW
CMU: HEA28a
2028-29 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
43.98 MW
CMU: HEA28b
2028-29 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
44.02 MW
CMU: HEA27a
2027-28 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
45.88 MW
CMU: HEA27b
2027-28 (T-4)
Fort Parkway Heartlands Birmingham B24 9QT
Open Cycle Gas Turbine (OCGT)
- Existing OCGT
46.18 MW
CMU: HEA26b
2026-27 (T-4)
Fort Parkway, Heartlands, Birmingham, B24 9QT
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEAR2a
2017-18 (T-1)
Fort Parkway, Heartlands, Birmingham, B24 9QT
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEAR2b
2017-18 (T-1)
Fort Parkway, Heartlands, Birmingham, B24 9QT
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEARTa
2020-21 (T-4)
Fort Parkway, Heartlands, Birmingham, B24 9QT
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: HEARTb
2020-21 (T-4)
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: EXETR2
2017-18 (T-1)
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY
None
- The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calcula…
CMU: EXETRa
2020-21 (T-4)
First
Previous
1
2
Next
Last
Data fetch time: 0.575s