Drax Power Station, Selby, North Yorkshire, YO8 8PH Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 28.75
  • Connection Capacity (CMU Registry) 30.53 MW
  • Anticipated Capacity (CMU Registry) 28.75 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name DRAX POWER LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) +4401757618381

Basic Information

Basic Information
  • Location Drax Power Station, Selby, North Yorkshire, YO8 8PH
  • Description This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G under the BSC. The net output of the CMU component will be the metered output for T_DRAXX-9G less the auxiliary load.
  • Company DRAX POWER LIMITED

Technical Details

Technical Details
  • Technology N/A
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type T-4

Auction Information

Auction Information
  • Auction 2020-21 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2,020
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID DX0916
  • Location and Post Code Drax Power Station, Selby, North Yorkshire, YO8 8PH
  • Description of CMU Components This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G under the BSC. The net output of the CMU component will be the metered output for T_DRAXX-9G less the auxiliary load.
  • Generating Technology Class N/A
  • Company Name DRAX POWER LIMITED
  • Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
  • _id 185,185
  • rank 0.06
  • Component ID T_DRAXX-9G
  • OS Grid Reference SE 667 267
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,020
  • Name of Applicant DRAX POWER LIMITED
  • CM Unit Name DRAX09

Field Value
_id 185185
Type T-4
rank 0.0573088
CMU ID DX0916
Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
Component ID T_DRAXX-9G
Delivery Year 2020
De-Rated Capacity
null
OS Grid Reference SE 667 267
Location and Post Code Drax Power Station, Selby, North Yorkshire, YO8 8PH
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G under the BSC. The net output of the CMU component will be the metered output for T_DRAXX-9G less the auxiliary load.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 3943
Type T-4
CMU ID DX0916
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2020-21 (T-4) Four Year Ahead Capacity Auction
CM Unit Name DRAX09
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2020
Opt Out Status Opt-In
Opt-Out Reason
null
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 28.752
Name of Applicant DRAX POWER LIMITED
Primary Fuel Type
null
Registered Holder DRAX POWER LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 30.532
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2020-DX0916-001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 28.752
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement 2017-01-20
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation 28.752
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone '+4401757618381
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2020/2021
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round
null
Long-Stop Date for the Minimum Completion Requirement
null