Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 291672 |
Type | T-4 |
rank | 0.158522 |
CMU ID | EMG-22 |
Auction Name | 2026-27 (T-4) Four Year Ahead Capacity Auction |
Component ID | E_FAWN-1 |
Delivery Year | 2026 |
De-Rated Capacity | 126.454 |
OS Grid Reference | SU 439 039 |
Location and Post Code | Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom |
Connection / DSR Capacity | 138.443 |
Primary Fuel of Component |
null |
Generating Technology Class | Combined Heat and Power (CHP) |
Description of CMU Components | Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 9748 |
Type | T-4 |
CMU ID | EMD-19 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2023-24 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | EMD-18 |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2023 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | ExxonMobil UK Limited |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Existing Generating CMU |
Storage Facility | No |
De-Rated Capacity | 71.816 |
Name of Applicant | ESSO PETROLEUM COMPANY,LIMITED |
Primary Fuel Type | Gas |
Registered Holder | ESSO PETROLEUM COMPANY,LIMITED |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 79.795 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2023-EMD-19-001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 71.816 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status |
null |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Date of Issue of Capacity Agreement | 2020-04-17 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity |
null |
Auction Acquired Capacity Obligation | 71.816 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+4402382477814 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2023/2024 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity |
null |
Anticipated Post-Refurbishing De-Rated Capacity |
null |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |