100 Montifichet Road, Westfield, Stratford E20 1GR Map

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 5.25
  • Connection Capacity (CMU Registry) 5.84 MW
  • Anticipated Capacity (CMU Registry) 5.25 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EAST LONDON ENERGY LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Basic Information

Basic Information
  • Location 100 Montifichet Road, Westfield, Stratford E20 1GR
  • Description Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
  • Company EAST LONDON ENERGY LIMITED

Technical Details

Technical Details
  • Technology N/A
  • Generation Type N/A
  • Connection Type N/A
  • De-Rated Capacity N/A
  • Connection / DSR Capacity N/A
  • Type TR

Auction Information

Auction Information
  • Auction 2016-17 (TR) Transitional Capacity Auction
  • Delivery Year 2,016
  • Status N/A
  • Clearing Price N/A

Additional Information

Additional Information
  • CMU ID CES002
  • Location and Post Code 100 Montifichet Road, Westfield, Stratford E20 1GR
  • Description of CMU Components Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
  • Generating Technology Class N/A
  • Company Name EAST LONDON ENERGY LIMITED
  • Auction Name 2016-17 (TR) Transitional Capacity Auction
  • _id 540,188
  • rank 0.06
  • Component ID CELESC2
  • OS Grid Reference TQ 385 847
  • Primary Fuel of Component N/A
  • Permitted on-Site Generating Unit N/A
  • Pre-Refurbishing De-Rated Capacity N/A
  • Post-Refurbishing De-Rated Capacity N/A
  • Generating Capacity of on-site Generating Unit N/A

CMU Registry Data

CMU Registry Data
  • Auction Capacity Auction
  • Type T-4
  • Delivery Year 2,019
  • Name of Applicant ENGIE UK HOLDING (SERVICES) LIMITED
  • CM Unit Name CELEYSC

Field Value
_id 540188
Type TR
rank 0.0573088
CMU ID CES002
Auction Name 2016-17 (TR) Transitional Capacity Auction
Component ID CELESC2
Delivery Year 2016
De-Rated Capacity
null
OS Grid Reference TQ 385 847
Location and Post Code 100 Montifichet Road, Westfield, Stratford E20 1GR
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 2824
Type T-4
CMU ID CES002
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2019-20 (T-4) Four Year Ahead Capacity Auction
CM Unit Name CELEYSC
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2019
Opt Out Status Opt-In
Opt-Out Reason N/A
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility
null
De-Rated Capacity 5.254
Name of Applicant ENGIE UK HOLDING (SERVICES) LIMITED
Primary Fuel Type
null
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 5.838
Maximum Obligation Period 1
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 5.254
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction N/A
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status
null
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity
null
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity
null
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity
null
Anticipated Post-Refurbishing De-Rated Capacity
null
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null